Huangpu Shipbuilding won the offshore platform repair project

On July 12, Huangpu Shipbuilding held the contract signing and groundbreaking ceremony of the “LH (Flower) 11-1” drilling platform dock repair project at the Longxue Plant. The drilling platform is scheduled to be repaired in the end of October, and the docking site will be docked. . This is since the 1980s, after 30 years, the yellow ship has successfully completed the drilling platform repair project.
"LH11-1" oil drilling platform, affiliated to China National Offshore Oil (China) Co., Ltd. Shenzhen Branch, is a semi-submersible drilling production equipment platform with a self-weight of 16,735 tons, a total length of 89.916 meters, a width of 74.676 meters, and a depth of 39.624 meters. It is 110.0 meters high. The platform is the first comprehensive overhaul and upgrade since the transformation and service in 1995, including structural changes, equipment overhaul, generator system expansion, living area upgrades, crane upgrades, and new electrical systems, underwater control. Systems, chemical systems, cable suspension systems and more.

Brake Master Cylinder For MAZDA

Brake Master Cylinder For Mazda,Front Master Cylinder,Replace Brake Master Cylinder,Brake Master Cylinder Compatible

Yuhuan Wantong Co. Ltd. , https://www.yhwtby.com