102 projects to be phased out in backward production capacity in Henan Province will be eliminated
China Drying Network News Henan Province to eliminate backward production capacity leading group office revealed that by the end of this year, 102 projects listed in the province to eliminate backward production capacity will be eliminated. In order to ensure that the eliminated backward capacity projects are legal and the production capacity is true, since June, the Office of the Leading Group for Eliminating Backward Production Capacity of Henan Province has checked the equipment and production line demolition of 102 outdated production projects one by one, and the authenticity and accuracy of the data. In particular, the verification of the authenticity of major issues such as the specification, type and quantity of production equipment (production lines), equipment purchase of original bills, etc. Up to now, 15 companies have completed the demolition of equipment, 28 are dismantling equipment, 56 have been discontinued, and ready to proceed with the demolition of equipment, 3 companies are still in production, plans to dismantle equipment in August after the shutdown. Bonded Neodymium Magnets,Curved Neodymium Magnets,Flat Neodymium Magnets,Neodymium Magnet Rod Dongguan Zhenglong Magnet Co., Ltd , https://www.zlkjmagnetism.com